- A10.2.17
- Layer thickness and compressive strength at an age of 28 days requirements must be in accordance with Table A10.6.
Table A10.6 HBMs minimum layer thickness and compressive strength Layer Road type Footway/ footpath/ cycle track 0 1 2 3 4 Combined Binder course & Sub-base NP NP NP NP NP 150 mm C1.5/2 Base NP NP NP 300 mm
C1.5/2200 mm
C1.5/2--- Base & sub-base NP 450 mm
C3/4450 mm
C3/4450 mm
C1.5/2350 mm
C1.5/2--- Sub-base or below 150 mm
C1.5/2150 mm
C1.5/2150 mm
C1.5/2150 mm
C1.5/2150 mm
C1.5/2150 mm
C1.5/2Maximum strength class
at 28 daysC9/12 C8/10 Notes:
NP = Not permitted
Minimum asphalt overlay thickness as per A3 to A7
HBMs are not permitted as CBGM base replacement