Structural layer thickness tolerances (A2.7)
- A2.7.1
- Several individual layers of material, commonly termed lifts, may be required to reinstate a structural layer.
- A2.7.2
- The thickness of each complete structural layer is specified as a nominal value.
- A2.7.3
- The lower tolerance for the thickness of a structural layer must be as follows:
- -5 mm for the surface course
- -10 mm for any other structural layer comprising bound material
- -20 mm for any other structural layer comprising unbound material
- A2.7.4
- There is no upper tolerance for structural layer thickness. However, where large thicknesses of surface course are used:
- the requirements for compacted lift thicknesses under A2.8 must be met as must the in-situ air-voids through the full depth of the as-laid surface course layer, as set out in S10.2.8.
- the required combined binder and base course material thickness is still required unless the binder course mixture is replaced with surface course mixture, as permitted by A2.0.4 and A2.0.5.
- the surface profile performance requirements set out in S2.2 must not be exceeded.
- A2.7.5
- Any combination of permitted tolerances for the thickness of each structural layer of bituminous or cement bound mixtures must not result in either of the following:
- An overall reduction in thickness of the bound pavement, excluding the sub-base, of more than 15 mm from the specified nominal thickness in a road, subject to an absolute minimum of 100 mm of bound materials. See S6.8.9(2) for an exception to this requirement where only the surface is trimmed.
- An overall reduction in the thickness of the bound pavement, excluding the sub-base, of more than 10 mm from the specified nominal thickness in a footway, subject to an absolute minimum of 60 mm of bound materials. See S8.6.3 for an exception to this requirement where only the surface is trimmed.
- A2.7.6
- If the combined thickness of the relevant layers equals or exceeds that of the Code requirements, then this will not be considered as a non-compliance with the Code provided that each individual lift meets the thickness requirements of Tables A2.5 and A2.6 and the bituminous mixtures meet the void requirements of S10.2.8.