Flexible and composite roads (S6)
-
Reinstatement methods (S6.1)
- General
- Method A – All permanent reinstatement
- Method B – Permanent binder course reinstatement
- Method C – Permanent base reinstatement
- Method D – Permanent sub-base reinstatement
- Method E – Permanent reinstatement incorporating interim surface overlay
- Other reinstatement methods
- Alternative reinstatement materials
- Sub-base reinstatement (S6.2)
- Base reinstatement (S6.3)
- Surface reinstatement (S6.4)
- Small openings, narrow trenches and access chamber covers (S6.5)
- Micro trenching (S6.6)
- Large diameter cores (S6.7)
- Base and edge preparation (S6.8)
- Tolerances (S6.9)