Footways, footpaths and cycle tracks (S8) Previous Next Reinstatement methods (S8.1) General Method A – All permanent reinstatement Method B – Permanent binder course reinstatement Method C – Permanent base reinstatement Method D – Permanent sub-base reinstatement Method E – Permanent reinstatement incorporating interim surface overlay Alternative reinstatement materials Sub-base reinstatement (S8.2) General Small openings and narrow trenches Alternative reinstatement materials (ARMs) Reinstatements adjacent to roads Surface reinstatement (S8.3) High duty and high amenity areas Areas surfaced with bituminous materials Areas constructed in concrete Modular footways, footpaths and cycle tracks Special materials Micro trenching (S8.4) Large diameter cores (S8.5) Edge requirements (S8.6) Vehicular trafficking (S8.7) Commercial access Domestic access Other trafficking Tolerances (S8.8) Previous Next