Skip to main content
HAUC
HAUC

General

S11.6.2
Before reinstatement, all test holes should be made safe and maintained in a safe condition.
S11.6.3
Test holes up to 25 mm diameter must be reinstated to an immediate permanent standard.
S11.6.4
Test holes larger than 25 mm diameter may be reinstated to an interim standard if required.
S11.6.5
In modular surfaces, preference should be given to lifting individual modules before drilling test holes whenever reasonably practical.
S11.6.6
In unmade ground, test holes must be tamped closed or filled with appropriate materials.