Additional standard materials (Appendix A10)
- General (A10.0)
- Modified Type 1F Unbound Mixture (0/20) (A10.1)
-
Hydraulically bound materials (HBMs) (A10.2)
- Constituents
- Storage of constituents at the central mixing hub
- Laboratory mixture design procedure for HBM
- Mixture performance requirements
- Requirements for production, storage and transport of HBMs
- Production control testing and checks
- Requirements for placement, compaction, protection and overlay
- Method Statement