Skip to main content
HAUC
HAUC

Other trafficking

S8.7.6
Where a footway, footpath, cycle track or specified pedestrian area is subjected to regular vehicle overrunning or parking, the existing structure may include thicker layers, higher quality materials or other strengthening measures.
S8.7.7
Reinstatement of such areas must match the existing layer thickness using similar or equivalent materials.