- A2.9.1
- The laying temperatures for bituminous mixtures must be in accordance with Table A2.7.
Table A2.7 Laying temperatures– Bituminous materials Material Binder grade Maximum temperature
at any stage (ºC)Minimum temperatures (ºC) Arrival * Minimum rolling # CGSC
DSC100/150 170 120 95 160/220 170 110 85 DBC 40/60 190 130 100 70/100 180 125 95 100/150 170 120 90 160/220 170 110 80 HRA SC# 40/60 190 140 110 70/100 180 125 90 100/150 170 120 85 HRA BC 40/60 190 130 105 70/100 180 125 90 100/150 170 120 85 SMA SC
SMA BC40/60 200 130 100 70/100 180 125 90 100/150 170 120 85 Porous Asphalt 125 135 110 85 190 145 110 85 Notes:
- * = In the lorry within 30 minutes after arrival on site.
- For coated slag mixtures temperatures may be 10ºC lower than the recommended values.
- # = See Table A2.8 for the final rolling temperatures when chippings are applied to HRA surface courses.
- To achieve acceptable air voids, most materials will require greater compactive effort as the temperature approaches the lower limit. Additives are available which can be used to assist compaction at lower temperatures
Table A2.8 Final rolling temperatures - HRA Binder grade Minimum temperature (°C) at
completion of rolling40/60 85
70/100 80
100/150 75
Note: When using modified bitumen or additives, different temperatures might be applicable.