- S3.4.1
- The sides of excavations in soft or loose ground must be provided with a side support system in most cases. The support system must be designed and installed to restrain lateral movement of the walls and should be installed without delay.
- S3.4.2
- Supports must be progressively withdrawn as backfilling and compaction progresses, and all voids carefully filled.