Skip to main content
HAUC
HAUC

Footways, footpaths and cycle tracks (S8)

S8.1.5
S6.5 must be followed for small openings and narrow trenches. For micro trenching, large diameter cores, cable channels and work around ironwork, S6.6, S6.7, S11.2 and S11.5 must be followed, respectively.
S8.9
Cable channels
Installation of cable channels in flexible footways and footpaths are covered in S11.2 and S11.5. Cable channels in rigid and modular footways and footpaths require approval via A9 (materials and technology).