To ensure you get the best experience, this website uses cookies.
Requirements for natural material modules
- A12.2.5
-
General for whole natural material modules
The reinstatement of whole natural material modules must be in accordance with the general requirements of A12.2.1 to A12.2.4.
- A12.2.6
-
Damaged natural material modules
- Where damaged modules are to be re-used in the reinstatement, a joint inspection must be arranged before starting excavation to agree the extent of usage of damage modules and the minimum size acceptable for re-use.
- The undertaker should make a photographic record of the joint inspection which should be agreed between the undertaker and the authority.
- The undertaker must use best endeavours to match existing profiles and meet the tolerances specified in S2, However, where the pre-existing profile of damaged modules is near or in excess of current intervention and construction tolerances specified in S2, it will be difficult for the undertaker to construct a complying reinstatement. The undertaker must use best endeavours to ensure that the interface between the reinstatement and the adjoining surfaces does not create a hazardous trips.