Method D – Permanent sub-base reinstatement

S6.1.12
The backfill and sub-base must be reinstated to a permanent standard at the first visit
S6.1.13
The interim base must be granular and the interim surfacing must be in accordance with the requirements of S6.1.9 to S6.1.11.
S6.1.14
On the second visit, all interim materials must be removed to the top of the sub-base, and a permanent base, binder course and surface course laid.