- S8.7.6
- Where a footway, footpath, cycle track or specified pedestrian area is subjected to regular vehicle overrunning or parking, the existing structure may include thicker layers, higher quality materials or other strengthening measures.
- S8.7.7
- Reinstatement of such areas must match the existing layer thickness using similar or equivalent materials.